Portfolio

Operational Assets

Browse our map and check out the information for each asset. The installed capacity is weighted by the Company’s equity stake in the assets and the concession term already takes into account the extension of the concession due to the GSF agreement.

Subtitle

Hydro

Wind

Hybrid

Ventos do Araripe lll

Ventos do Piauí l

Ventos do Piauí ll

Ventos do Piauí lll

Sol do Piauí I

Amador Aguiar l e ll

Picada

Igarapava

Porto Primavera

Machadinho

Campos Novos

Campos Novos (Enercan)

Barra Grande (Baesa)

PE PI SC SP MG

Assets under Construction

The company’s expansion strategy is based mainly on the development of its project pipeline, which is made up mostly of solar projects. For these, in the third quarter of 2022 we began building the solar and hybrid projects in the company’s pipeline, which together, once completed, will add 548 MWac in installed capacity and 167 average MW in physical guarantee.

Asset Shareholding Ratio Source Installed Capacity (mw) Physical Guarantee (average mw)
Sol do Piauí 100.0% Fotovoltaica 500.0 154.2
Total 500.0 154.2

For more information on our assets, visit our Interactive Spreadsheet, click here.

Ventos do Araripe lll
Ventos do Araripe lll

SHARE 100%

SOURCE Wind

INSTALLED CAPACITY (MW) 357.9

END OF CONCESSION/AUTHORIZATION July/2049

Ventos do Piauí l
Ventos do Piauí l

SHARE 100%

SOURCE Wind

INSTALLED CAPACITY (MW) 205.8

END OF CONCESSION/AUTHORIZATION March/2051

Ventos do Piauí ll
Ventos do Piauí ll

SHARE 100%

SOURCE Wind

INSTALLED CAPACITY (MW) 206.8

END OF CONCESSION/AUTHORIZATION November/2055

Ventos do Piauí lll
Ventos do Piauí lll

SHARE 100%

SOURCE Wind

INSTALLED CAPACITY (MW) 202.4

END OF CONCESSION/AUTHORIZATION November/2055

Sol do Piauí I
Sol do Piauí I

SHARE 100%

SOURCE Hybrid

INSTALLED CAPACITY (MW) 48.0

END OF CONCESSION/AUTHORIZATION February/2051

Amador Aguiar l e ll
Amador Aguiar l e ll

SHARE 9.0%

SOURCE Hydro

INSTALLED CAPACITY (MW) 40.6

END OF CONCESSION/AUTHORIZATION November/2042 and January/2042

Picada
Picada

SHARE 71.4%

SOURCE Hydro

INSTALLED CAPACITY (MW) 35.7

END OF CONCESSION/AUTHORIZATION March/2041

Igarapava
Igarapava

SHARE 17.1%

SOURCE Hydro

INSTALLED CAPACITY (MW) 35.9

END OF CONCESSION/AUTHORIZATION Setember/2031

Porto Primavera
Porto Primavera

SHARE 100%

SOURCE Hydro

INSTALLED CAPACITY (MW) 1,540.0

END OF CONCESSION/AUTHORIZATION April/2056

Machadinho
Machadinho

SHARE 3.4%

SOURCE Hydro

INSTALLED CAPACITY (MW) 38.4

END OF CONCESSION/AUTHORIZATION October/2035

Campos Novos
Campos Novos

SHARE 17.5%

SOURCE Hydro

INSTALLED CAPACITY (MW) 153.9

END OF CONCESSION/AUTHORIZATION January/2039

Campos Novos (Enercan)
Campos Novos (Enercan)

SHARE 16.0%

SOURCE Hydro

INSTALLED CAPACITY(MW) 141.1

END OF CONCESSION/AUTHORIZATION January/2039

Barra Grande (Baesa)
Barra Grande (Baesa)

SHARE 10.3%

SOURCE Hydro

INSTALLED CAPACITY (MW) 71,2

END OF CONCESSION/AUTHORIZATION March/2041